Harsiga, E., Toha, T. and Komar, S. (2018) “CALCULATION OF PIT 2 PRODUCED OVERBURDEN VOLUME AND THE ANALYSIS OF PREPARATION OF PIT 1 MINE VOID UTILIZATION AT SUPAT BLOCK PT. BATURONA ADIMULYA MUSI BANYUASIN, SOUTH SUMATERA”, Indonesian Journal of Environmental Management and Sustainability, 2(2), pp. 42-47. doi: 10.26554/ijems.2018.2.2.42-47.